项目简介

The new two-story elementary school building provides the spaces and resources that students need for academic success. 大约95,000 square foot school meets the district’s elementary educational specifications and provides space for up to 650 students. A collaborative process resulted in a building designed to fit into the neighborhood. It will provide outdoor learning, play, and recreation areas.

The new school has been designed to provide an equitable, safe, and inspiring learning environment for the entire school community. Learning clusters have classrooms surrounding learning commons.

可持续设计及建造

In keeping with SPS’s clean energy goals, operation of the new school does use fossil fuels. 除了, 屋顶的设计是为了容纳太阳能电池板, which could offset 80% of the building’s energy use in the future.

减少能源使用的特点:

  • 地热供暖系统
  • Highly efficient ventilation that recovers heat before air leaves the school
  • 节能LED照明
  • 高度隔热的墙壁和屋顶
  • 高性能玻璃纤维窗户

其他可持续设计策略:

  • 雨水管理与雨水花园
  • 本地抗旱植物
  • 屏蔽现场照明,减少光污染
  • Demolition and construction debris sorted and recycled

预计能源使用指数: 17.3

设计公司: 南京汽车架构

总承包商/施工管理: 此施工

项目预算: $90.3M

资金来源: Funded by the Building Excellence V (BEX V) Capital Levy, approved by Seattle voters in 2019.

项目的照片

一根涂成白色的工字钢,上面写着签名
Northgate 小学 School students signed one of the beams for the new school – Dec. 2021
a wall on a stairwell has a signed steel beam embedded in it
Beam signed by students early in construction now located in stairway – Feb. 2023
室内一扇滑动玻璃门
教室内安装滑动门- 1月. 2023
tubular ceiling lights hang from a high ceiling with a stairway below them
入口灯已安装- 2月. 2023
a stairway with a landing in the middle that makes a right angle turn
西楼梯视野- 2月. 2023
a classrom wall section has a nook below cabinets that includes two facing benches with a ledge between them. 旁边是一扇窗户下面的开放式架子. 这两个区域都以明亮的绿色为主调
艺术教室舒适的角落和架子- 2023年3月
tube shaped light fixtures hang from a high ceiling in a two story space with a stairway
照明安装- 2023年4月
looking down into a large space with a stairway for walking, a stairway for sitting, and a slide
在公共场所学习楼梯和滑梯- 2023年4月
三层长凳房间角落里的弯曲的三层长凳
图书馆小组学习区- 2023年4月
a curved wall with windows has bookshelves below the windows
图书馆个案- 2023年4月
part of a two story building with a canopy that has wood edge and windows. 大楼上的牌子上写着詹姆斯·鲍德温小学
Entrance to new building with new school name – May 2023
an interior stair leads up from a concrete floor past a group of windows. 楼梯旁边有一个滑梯
Stair in the commons toward the entry to the space – May 2023
带有接待台的室内空间. 后面的墙上写着詹姆斯·鲍德温小学
欢迎接待区- 2023年6月
从楼梯中间的平台上看. you can see part of the second floor with a curved glass wall and part of the lower floor.
Central gathering area near the main entrance – June 2023
aerial photo of a large building with a road at the top and trees along the road
鸟瞰图- 2023年8月
indoor space with a slated ceiling, a table, stools, and a counter and sink. 它被一堵墙与大厅隔开
带家具的学习公共场所
part of a hallway with doors set back from the path by tile. 水槽挂在一端的墙上
学生洗手间和洗手- 2023年6月
a room with two refrigerators, cabinetry, a stove, two microwaves, and some tables and chairs
完工的员工休息室- 2023年6月
part of a hallway with wood benches on one side by the windows and a curved nook on the other side
中央走廊- 2023年6月
looking toward a stairway leading up in front of windows with a wooden platform underneath
通往二楼的楼梯- 2023年6月
a classroom has groups of tables with chairs, bookcases, whiteboards, lighting and ceiling fans
配备家具的教室- 2023年6月
a small room with a video screen, windows on one wall, a half circle table and five stools
Small group space with furniture installed – June 2023
outdoor looking toward a long low building with a stairway, 具体走, 还有前面的建筑材料
Demolition of old Northgate 小学 School building to begin in July – June 2023
looking up a walkway toward a one and two story building with a covered entry and window frames that are orange and green
Front entry of new 詹姆斯鲍德温小学 – August 2023
a parking lot next to a one story building with an orange window frame
新员工停车场- 2023年8月
一台挖掘机正在拆除一座建筑物
Demolition of the old Northgate 小学 building – July 2023
aerial view of a large building with a white roof with a construction area behind it. 背景中可以看到高速公路
Aerial view of new building with old building demolition complete – August 2023
aerial view of a construction area next to a new building
Old school has been demolished and work has begun on the outdoor play areas – August 2023
大建筑物和树木的高角度视图
Completed school building with play area and play field in progress – Sept. 2023
aerial view of a large building and paved areas with some construction work taking place in the lower portion
向北鸟瞰图- 10月. 2023
aerial view of a large building with a dirt field to the left and parking lots in front
View of the school with the future field to the left – Nov. 2023
人们正在安装带有设备的游乐设施
安装游戏结构- 11月. 2023
铺有条纹的地方
交通花园条纹- 12月. 2023
一个有水泥人行道的绿色草地运动场
场地草皮安装- 12月. 2023

詹姆斯鲍德温小学

11725 1st Ave NE
西雅图,华盛顿州98125

学校简介

学校的网站